project summary
Project Type
Luxury Apartments
spacer
Location
kundanoor, Kochi
spacer
Unit Types
3 BHK Apartments
spacer
Project Status
Work in Progress
spacer
1
ebrochure
ongoing
specifications
STRUCTURE
:
Foundation - DMC Pile Foundation
Super structure - R.C.C. framed structure.
FLOORING
:
Vitrified Tiles for entire inside flat area except bathrooms, kitchen and work area. Joint free ceramic tiles for common areas & staircase.
POSH ENTRANCE LOBBY
:
Granite Flooring.
WALLS
:
Concrete brick walls with cement plastering. Putty finish in the living and dining rooms.
DOORS & WINDOWS
:
Wooden doors and high quality aluminium windows. Decorative main entrance door and all other doors fully paneled with MDF/ Duratuff, except for toilet. Windows fully glazed.
PAINTING AND APPEARANCE
:
Acrylic washable distemper for interior walls, with water proof cement paint for exteriors.
KITCHEN/ WORK AREA
:
Ceramic tile flooring and granite worktop with single bowl steel sink for dish washing, glazed tiles above the worktop to a height of 60cm and provision for exhaust fan.
TOILETS
:
Toilets will be provided with mat finished floor tiles and walls will be fixed with glazed tiles up to 180cm height. European W.C. in all toilets. All toilets are provided with wash basin, soap dish and towel rod. Provision for water heater in the master bedroom toilet. All bathrooms are provided with standard CP fittings with concealed plumbing. Toilet doors will be PVC\Moulde.
ELECTRICAL
:
Concealed copper wiring with PVC conduit for fan/lights/power plug points. Fans,Tube lights and Fancy Fittings will be provided.
INDEPENDENT ELECTRICAL CONNECTION AND METERS
:
Independent electrical connection to each flat will be provided by the builder and the builder is not responsible for the delay, if any, occurred from the side of the KSEB\Ele. inspectorate in getting the independent electrical connection to each flat. Normally 2 to 3 months time will take to get the independent electrical connection to each flat after getting the completion certificate from the Municipality. However, during this period of delay, alternate arrange- ments will be provided by the builder for the power supply to the flats, who required it, which will be charged extra.
TELEPHONE
:
Concealed conduit for telephone line. Socket will be provided in drawing room and master bedroom.
TV/CABLE TV
:
Concealed conduit for TV/Cable TV antenna cord. Socket will be provided in the drawing room.
Intercom facility from security to flats.
WATER SUPPLY
:
Sump tank and over head tank for drinking and all other purposes.
CAR PARK
:
One no. exclusive car park.
LIFT
:
Bed lift.
Standby generator with capacity to provide emergency power for lift, water pumps, common lighting and 500 watts supply to each flat.
SAFETY
:
Modern fire fighting system as per statute.
Security Surveillance.