project summary
Project Type
Commercial cum residential Apartments
spacer
Location
Eroor North, Thripunithura
spacer
Unit Types
2 and 3 BHK Apartments
spacer
Project Status
Ready to Occupy
spacer
1
ebrochure
ongoing
specifications
FOUNDATION
:
DMC Pile foundation
SUPER STRUCTURE
:
R.C.C. framed structure
FLOORING
:
Vitrified Tiles for entire inside flat area except bathrooms, kitchen and work area. Joint free ceramic tiles for common areas & staircase.
POSH ENTRANCE LOBBY
:
Granite Flooring.
WALLS
:
Concreete hollow blocks / Wire cut brick walls.
DOORS & WINDOWS
:
Decorative main entrance door and all other doors are skin finished doors.
PAINTING AND APPEARANCE
:
Acrylic washable distemper for interior walls, with water proof cement paint for exteriors.
KITCHEN/ WORK AREA
:
Ceramic tile flooring and granite worktop with single bowl steel sink for dish washing, glazed tiles above the worktop to a height of 60cm and provision for exhaust fan and berth slab on one side.
TOILETS
:
Toilets will be provided with mat finished floor tiles and walls will be fixed with glazed tiles upto 180cm height. European W.C in all toilets. All toilets are provided with wash basin, soap dish and towel rod. Provision for water heater in the master bedroom toilet. All bathrooms are provided with standard CP fittings with concealed plumbing. oilet doors will be PVC\Moulded.
Electrical
:
3 phase connection. Concealed copper wiring with PVC conduit for fan/lights/power plug points. Fans, Tube lights and Fancy Fittings will be provided.
INDEPENDENT ELECTRICAL CONNECTION AND METERS
:
Independent electrical connection to each flat will be provided by the builder and the builder is not responsible for the delay, if any, occurred from the side of the KSEB/ Elec. Inspectorate in getting the independent electrical connection to each flat.. Normally 2 to 3 months time will take to get the independent electrical connection to each flat after getting the completion certificate from the Muncipality. However, during this period of delay, alternate arrangements will be provided by the builder for the power supply to the flats, who required it, which will be charged extra.
TELEPHONE
:
Concealed conduit for telephone line. Socket will be provided in drawing room and master bedroom.
TV/CABLE TV
:
Concealed conduit for TV/Cable TV antenna cord . Socket will be provided in the drawing room.
LIFT
:
2 nos high speed lifts with stand by generator with capacity to provide emergency power for Lift, Water Pumps, Common Lighting and 500 watts supply to each
CAR PARK
:
One covered car park will be provided.
SAFETY
:
Modern fire fighting system as per statute.
LOAN
:
Loan facility available from all leading banks/ financial institutions.